BIM Models with LOD 300 of Eye Hospital Building

Industry: Construction

Location: Egypt

The Objective

Create Architectural, Structural & MEP BIM Models with LOD 300 for a new upcoming hospital project.

The Solution

BIM models for Architectural, structural and MEP disciplines were created using Revit. Clashes were detected and reported. A clash free model was prepared with material takeoffs and project completion schedules.

Technology/Software Used

Revit

Challenges

- Input files received in form of PDF were not of the best quality. Several images and details were blurred & unclear.
- Level of detailing required was high; this made the files heavy and difficult to manage.
- There were numerous clashes in the models that had to be detected and reported.

Engineering Solution

The project required development of intelligent BIM with LOD 300 from PDF files for a National Eye Hospital in Egypt. A team of modelers and BIM experts was deployed to execute this project of a complex nature.

Benefits

• Project commenced with detailed examination of PDF files received as input.
• These PDF files were used to convert project data into intelligent BIM.
• BIM for architectural, structural and MEP disciplines were developed using Revit.
• Models were examined for clashes. A lot of clashes were detected and reported for mitigation.
• Once the clashes were resolved, the models were iterated and a clash free BIM was developed.
• Further the models were developed with quantity take offs and project completion schedules; a comprehensive approach was adopted to implement higher collaboration in the project.
• Prime emphasis was given towards auditing and improvisation to ensure that the model was as per international quality standards.
• The models underwent a multilayered quality check before they were handed over to the client.
• The project was completed within 45 days, and at the end of this time frame, all the clashes were resolved.
• If these clashes had been left undetected, this would have led to huge losses at the time of actual construction.
• BIM based, material take-offs & project completion schedules helped client streamline the processes and hence reduce the overall cost and time for construction.



BIM Models with LOD 300 of Eye Hospital Building
Published:

BIM Models with LOD 300 of Eye Hospital Building

BIM models for Architectural, structural and MEP disciplines were created using Revit. Clashes were detected and reported. A clash free model was Read More

Published:

Creative Fields